Casserly PM was appointed when a major roof replacement project was needed at Salford Quays and Leaseholders were frustrated at significantly increased charges due to lack of long-term planning by previous managing agents.
The Client
Urban Waterside Manchester Company Limited is another property from our block management in Manchester portfolio.
The Problem
A development in the heart of Salford Quays, with residents of 70 houses and 30 flats, creating a very close and caring community. Casserly Property Management was appointed as Managing Agent in 2015 when a major project of roof replacement was to take place on one of the residential blocks. Leaseholders of flats were frustrated at having to pay significantly increased service charges, due to low reserve funds following a lack of long-term financial planning by the previous managing agents.
Our Solution
During the first few years of management by Casserly Property Management, in conjunction with surveyors at Wilkinson Cowan Partnership, the replacement of two remaining roofs, at Harbour Place and Merchants House, were successfully completed.
Since then the financial reserves have been built up slowly over several years - alongside keeping service charge levels manageable for leaseholders - but still allowing further refurbishment works to take place, including:
-
Replacement of Communal Doors and Windows
The existing rotted timber communal windows and entry doors were replaced with a PVC-u alternatives. These provided reduced maintenance requirements and vastly improved energy efficiency, for all affected communal areas. The existing fenestration patterns were replicated, ensuring the architectural appearance of the elevations was retained.
-
Major Repair Works to one of the Lifts
These works included the replacement of the lift control system, the door operating equipment, the landing door equipment and all other associated works.
Casserly Property Management are now working, with Torside Building Consultants, to undertake internal refurbishment works in the apartment blocks. These projects include new flooring, lights, doors, ceilings and decoration. These works were identified as a priority by leaseholders, following a residents' survey carried out in 2023.
A huge amount of work has been completed - whilst service charge contributions for all leaseholders have been reduced by half, since Casserly Property Management's appointment. This has been achieved by systemically planning the reserve fund collection over a prolonged period, following the production of a 25-year maintenance plan at the development.